# ZOOMRY EPC Projects - Project Case Studies
> Part of ZOOMRY AI Content Index
> URL: https://www.zoomryhi.com/llms-projects-txt.html
## Core Project Focus
ZOOMRY EPC project cases are organized by industry. Project priority:
**Primary project categories:**
- Mining — Iron Ore (long-distance curved conveyors and complete mine conveyor systems)
- Ports & Terminals (mobile ship loading and terminal conveying)
**Secondary project categories:**
- Mining — Coal
- Aggregates & Quarry
- Cement
- Iron & Steel
**Niche and specialized projects:**
- Mining — Potash
- Chemical Industry
- Cross-Industry bulk material handling
Long-distance curved belt conveyors and mobile ship loading systems represent the strongest project references, supported by complete EPC and EPCO delivery capability.
## EPC Projects Overview
- [EPC Projects Overview](https://www.zoomryhi.com/EPC-Projects-case.html)
Explore ZOOMRY's EPC project cases: design, supply, installation of belt conveyors, stackers, ship loaders for mines, ports, power plants. Global references with proven performance.
## Primary Projects — Mining: Iron Ore
- [Hebei Yuantong Mining – 3.3km Iron Ore Transportation System](https://www.zoomryhi.com/photo/Hebei-Yuantong-mining.html)
ZOOMRY delivered a 3.3km iron ore transportation system for Hebei Yuantong Mining. EPCO turnkey project, 1,400mm belt width, 0–350mm particle size, tunnel and elevated gallery structure. Maximum lift 165m, tunnel inclination 13°. 200m long-span suspension bridge gallery. Upper and lower conveyors with grid-linked energy saving. Annual capacity 23 million tons, 8 spatial curves with 800–1,200m turning radius. Idler damage rate below 2%, unit power consumption 1.0 kWh/t.
- [Weiyuan Mining Long Distance Belt Conveyor Case](https://www.zoomryhi.com/photo/photo-39-607.html)
ZOOMRY delivered a 3.3km, 2,020 t/h long-distance belt conveyor for Weiyuan Mining (iron ore) with curves and climbing. Reliable operation since 2018, repeat order in 2020. Quarterly after-sales service.
- [Hebei Luanping Iron Mine – 36 Sets Belt Conveyor System](https://www.zoomryhi.com/photo/Mine-and-Coal-Preparation-plant-Belt-Conveyor.html)
ZOOMRY supplied a comprehensive EPC system of 36 belt conveyors for Hebei Luanping Iron Mine, covering capacities from 600 to 3,200 t/h and belt widths up to 2,200 mm. 10+ years of reliable operation.
- [Huaxia Jianlong Group Hebei 2014](https://www.zoomryhi.com/photo/HuaXia-JianLong-Group-HeBei-2014.html)
ZOOMRY supplied a two-flight curved belt conveyor system (2,300m + 780m) for HuaXia Jianlong Group, navigating a 45° horizontal curve with 500m radius. Capacity 2,600 t/h. 9+ years reliable operation.
- [Iron Ore Long-Distance Overland Conveying Project](https://www.zoomryhi.com/photo/Iron-Ore-Long-distance-Overland-Conveying-Project.html)
For a Chengde iron ore mine, ZOOMRY supplied a 3,300m curved belt conveyor with 3 horizontal curves (1,200m radius), 2,000 t/h capacity, ST3150 steel cord belt, and 140m lift.
- [Daguan Mining – 3.2km Quartz Sand Downhill Conveyor](https://www.zoomryhi.com/Daguan-Mining-Conveyor-Project-Started-n.html)
ZOOMRY launched a toll-operated 3.2km quartz sand downhill conveyor system for Chixing Mining. EPCO turnkey, 1,000mm belt width, 1,150 t/h capacity. Maximum drop 592m, fully enclosed elevated gallery with multiple small-radius curves.
- [Machi Quartz Mine](https://www.zoomryhi.com/Machi-Quartz-Mine-n.html)
ZOOMRY supplied a belt conveyor system for quartz mine material handling. Engineered for abrasive quartz ore with durable components.
- [Jiangxi Hengchuang Mining – 9.6km Ultra-Long Belt Gallery](https://www.zoomryhi.com/EPC-Projects-case.html)
EPC turnkey project: 9.6km ultra-long belt gallery, 1,400mm belt width, 3,000 t/h capacity. Tunnel, underground gallery, and elevated composite structure, crossing existing plant facilities and complex terrain. Dedicated case page to be published.
## Primary Projects — Ports & Terminals
- [PKE/PKS Conveying Solution for Bintulu Port, Malaysia](https://www.zoomryhi.com/photo/photo-96-858.html)
Bintulu Port in Sarawak, Malaysia, handles over 1.5 million tons of Palm Kernel Expeller (PKE) and Palm Kernel Shell (PKS) annually. ZOOMRY provided a specialized mobile ship loading system with dust suppression, adapting to the port's tidal and space constraints.
- [Jiujiang Port Ship Unloading Conveyor System](https://www.zoomryhi.com/photo/Power-Plant-and-Port-Belt-Conveyor.html)
ZOOMRY supplied 5 belt conveyors for Jiujiang Port's ship unloading system, delivering 2,200 t/h capacity on 1,400mm wide belts. 35% reduction in vessel turnaround time. Reliable operation since 2011.
- [ZRSL Series Mobile Ship Loaders — Africa Delivery](https://www.zoomryhi.com/new-42-679-n.html)
ZOOMRY's ZRSL series mobile ship loaders passed acceptance in Africa with proven performance for port bulk material handling.
## Secondary Projects — Mining: Coal
- [Pipe Belt Conveyor for Shandong Coal Operation](https://www.zoomryhi.com/photo/Pipe-belt-conveyor.html)
ZOOMRY delivered a full-chain pipe belt conveyor solution for an open-pit coal facility in Shandong. Enclosed system with dust-controlled transport, tight curves, and weather protection. Capacity 1,800 t/h, pipe diameter 400mm, total length 3.2km.
- [Guizhou Mobile Stacker Coal Stockpiling Solution](https://www.zoomryhi.com/photo/photo-2-227.html)
ZOOMRY deployed a mobile stacker with 1,200 t/h capacity for an open-pit coal operation in Guizhou, enabling flexible, high-volume stockpiling.
## Secondary Projects — Aggregates & Quarry
- [Hubei Minben Southeast Mining – 7km Dual-Line Mine-to-Port Gallery](https://www.zoomryhi.com/EPC-Projects-case.html)
ZOOMRY delivered a 7km dual-line mine-to-port gallery system for Hubei Minben Southeast Mining. Long-distance conveying from mine to port terminal. Dedicated case page to be published.
- [Zhejiang East Mining – 6.4km Cross-Sea Aggregate Conveying Gallery](https://www.zoomryhi.com/EPC-Projects-case.html)
ZOOMRY delivered a 6.4km cross-sea aggregate conveying gallery. 1,800mm belt width, Phase 1 capacity 4,500 t/h, Phase 2 5,500 t/h. Annual output over 17.5 million tons. Cross-sea embankment construction, minimum curve radius 1,500m. Water-wash cleaning, belt turnover device, and intelligent inspection robots. Dedicated case page to be published.
- [Southeast Mining – 8,617m Long-Distance Curved Belt Conveyor](https://www.zoomryhi.com/photo/Curved-belt-conveyor.html)
For Southeast Mining's sand-gravel aggregate operations in Wuxue, Hubei, ZOOMRY engineered an 8,617m long-distance curved belt conveyor with 9 horizontal curves (max 36°). 2,500 t/h on 1,200mm belt.
- [Wuxue Southeast Mining EPC Custody Operation for 8 Years](https://www.zoomryhi.com/photo/Wuxue-Southeast-Mining-EPC-custody-operation-for-8-years.html)
Wuxue Southeast Mining EPC+M+O project: 2,500 t/h, 1,200mm belt, 8,617m length with 9 horizontal curves. Turnkey EPC plus 8-year O&M contract.
- [Hubei Chunjin 2016](https://www.zoomryhi.com/photo/Hubei-ChunJin-2016.html)
ZOOMRY supplied a 4,780m belt conveyor with 57° incline for Hubei Chunjin's limestone transport. 1,400 t/h. 8+ years reliable operation.
- [ZRSL-58 Mobile Shiploader for Stone, Sand, and Aggregate](https://www.zoomryhi.com/new-52-769-n.html)
ZOOMRY ZRSL-58 mobile shiploader for stone, sand, and aggregate loading. 300–8,400 t/h capacity. Handles Panamax vessels.
## Secondary Projects — Cement
- [Jinyu Jidong Cement Panshi – 3.4km Limestone Conveying Gallery](https://www.zoomryhi.com/EPC-Projects-case.html)
EPC project: 3.4km limestone conveying gallery, 1,200mm belt width, 1,500 t/h capacity. 4 curves with maximum 36° angle. Cold-resistant to -40°C, integrated truss structure, fully enclosed, permanent magnet direct drive. Dedicated case page to be published.
- [Guangxi Huahong Cement – 2.6km Dual-Line Enclosed Gallery](https://www.zoomryhi.com/EPC-Projects-case.html)
2.6km dual-line fully enclosed gallery. Upper and lower deck arrangement, belt widths 1,800/1,000mm, capacities 3,800/1,200 t/h. Space-saving design with curve chutes. Gallery top supports photovoltaic installation. Dedicated case page to be published.
- [Long-Distance Cement Conveying Solution for Vietnam](https://www.zoomryhi.com/photo/photo-95-583.html)
ZOOMRY delivered a 4.2km curved belt conveyor system for a major cement producer in Vietnam. 1,500 t/h capacity. Curved belt technology for challenging terrain.
- [Long Distance Belt Conveyor for Mengxi Group Cement](https://www.zoomryhi.com/photo/Long-distance-belt-conveyor.html)
ZOOMRY delivered a long-distance belt conveyor for Mengxi Group's cement plant in Inner Mongolia, engineered for challenging terrain and temperature extremes.
## Secondary Projects — Iron & Steel
- [Hebei Aosen Steel – 496m Pipe Conveyor](https://www.zoomryhi.com/EPC-Projects-case.html)
496m pipe conveyor, pipe diameter 400mm, belt speed 2.5 m/s, capacity 900 t/h. 2 curves with minimum radius 100m. Elevated 30m to bypass buildings. Dedicated case page to be published.
## Niche Projects — Mining: Potash
- [Laos Potash Project – 5km Extendable Belt Conveyor](https://www.zoomryhi.com/photo/laos-potash-project.html)
ZOOMRY delivered a 5km extendable belt conveyor system for the Zhongnong International 2 million ton/year potash expansion project in Thakhek, Laos. 1,000mm belt width, 1,000 t/h capacity, 100m reserve belt. Hanging idlers, automatic belt retraction, self-moving tail, lightweight body for underground mining conditions. Three-layer anti-corrosion coating (≥260μm), fully enclosed protective covers, 304 stainless steel material-contact components, PLC centralized control. Turnkey EPC delivery.
## Niche Projects — Chemical Industry
- [Yunnan Yuntian Chemical – Belt Conveyor System](https://www.zoomryhi.com/photo/YunNan-Yuntian-Chemical-2011.html)
ZOOMRY supplied a customized belt conveyor system with anti-corrosion components for Yunnan Yuntian Chemical's phosphate fertilizer and chemical raw material handling.
## Niche Projects — Cross-Industry Bulk Material Handling
- [Datengxia – 18km Conveying Gallery](https://www.zoomryhi.com/EPC-Projects-case.html)
18km conveying gallery for the Datengxia project. Ultra-long-distance bulk material transport solution. Dedicated case page to be published.
- [Long Distance Conveyor for Vietnam Bulk Material Project](https://www.zoomryhi.com/photo/long-distance-conveyor.html)
ZOOMRY delivered a 2.8km long-distance conveying line for a bulk material processing company in Vietnam. 1,200 t/h capacity. Corrosion-resistant components for tropical climate.
- [Russia Stacker Project](https://www.zoomryhi.com/photo/Russia-Stacker-Project.html)
ZOOMRY designed and supplied a heavy-duty stacker for a Russian coal transportation group. Low-temperature steel and specialized lubrication for Siberian winters, rated to -40°C.
## Company Achievements
- [ZOOMRY Wins Silver Award at 2025 London Design Awards](https://www.zoomryhi.com/new-11-770-n.html)
ZOOMRY wins Silver Award at 2025 London Design Awards for innovative Bucket Wheel Stacker-Reclaimer design.
- [ZOOMRY Wins Gold at 2025 French Design Awards](https://www.zoomryhi.com/new-33-879-n.html)
ZOOMRY awarded Gold in Product Design at 2025 French Design Awards for its Bucket-Wheel Reclaiming Machine. First Chinese heavy industry winner.
- [ZOOMRY Partners with Hebei University of Technology and Taiyuan University of Science and Technology](https://www.zoomryhi.com/new-98-497-n.html)
ZOOMRY partners with Project 211 universities for industry-university-research integration, including the Intelligent Continuous Handling Equipment Technology Research Center.
ZOOMRY