EPC Project case

EPC Project case

Wuxue Southeast Mining·EPC+M+O for 8 years

Wuxue Southeast Mining | 2500t/h Long-Distance Curved <a href=https://www.zoomryhi.com/belt-conveyor.html target='_blank'>belt conveyor</a> EPC + 8-Year O&M
★ FLAGSHIP PROJECT | EPC + M&O (8 Years)

Wuxue Southeast Mining
Long-Distance Curved Belt Conveyor System

2,500 t/h Sand Aggregate · 8,617 m complex terrain · 9 horizontal curves · Max curve angle 36°

Capacity

2,500 t/h
Sand & aggregate

Belt width

1,200 mm
High-abrasion resistant belt

Length

8,617 m
Single long-distance line

Curves

9 locations
Max turning angle 36°

Contract model

EPC+M&O 8 yr
Design · Procurement · Construction + Operation

Material

Sand & aggregate
0-31.5 mm

The Wuxue Southeast Mining project is a typical “long-distance, multi-curve, large-angle” belt conveyor system in Central China. The entire route spans 8.6 kilometers, crossing hills, gullies and existing roads. It features 9 horizontal and vertical curves, with a maximum horizontal curve angle of 36°, imposing high demands on anti-deviation, special idler arrangements in curved sections and dynamic design. The project adopts an EPC + 8-year custody operation & maintenance (EPC+M+O) model, covering engineering design, equipment supply, civil works, installation and long-term O&M, ensuring high efficiency, low energy consumption and safe operation of the mine logistics system.

⚙️ Key Technical Solutions & Highlights

  • Optimized spatial curve design — Finite element dynamic analysis to determine forced guiding idlers, transition geometry and belt stress control for 36° sharp turns.
  • Anti-deviation & spillage control — Special five-roll idler sets, centralizing guide devices and automatic belt tracking system ensure stable operation over 9 curve segments.
  • Long-distance drive configuration — Multiple distributed drive stations with soft-start and power balancing reduce belt tension and energy consumption.
  • EPC + 8-year custody operation — Full lifecycle responsibility from design and construction to daily operation, maintenance, wear parts replacement and performance optimization.
  • Real-time condition monitoring — Belt rip detection, temperature/vibration sensors on pulleys, and centralized SCADA for predictive maintenance.

PREVIOUS:Long-Distance Limestone Conveying Solution in Hubei